Search
Wish list
Region
Region (hu)
Products
Company
Focus on
Contact
de  en  pl  fr  hr  nl  hu  it  sv  sl  cn  es

QLD State Netball Stadium - Brisbane

Maintaining the integrity of waterproofing under a base slab

MAINTAINING THE INTEGRITY OF WATERPROOFING UNDER A BASE SLAB
QLD STATE NETBALL STADIUM – BRISBANE

Project Information

Maintaining the integrity of waterproofing under a base slab

Electrical and data services enter the building via conduits passing through a core filled block wall with a membrane waterproofing into the Main Switchboard Room.

The challenge was maintaining the integrity of the waterproofing as once the services were connected through the wall, a slab would cover the ground above and would no longer be accessible.

Solution was for the client to arrange the wall to be waterproofed by the other contractor, then core-hole through the membrane for the required service entries. Hauff-Technik DFK Wall Flange was then drilled into the surrounds of the core-hole using water tight screws and added sealant. In just a couple of minutes Hauff Technik system cover was attached to the DFK or DG and KME Services connected the conduit to the system cover.